Affinity Water capacity and pressure evidence

UTT/26/1635/OP · Submitted 2026-10-21 · Published here 21 November 2026

Archive of the email as submitted. Personal postal details omitted. Statements and requests reflect the evidence available on the submission date; this is not a new submission.

Dear Ms Beale,

Please register this supplementary objection and place the attached completed Affinity Water response, reference DSR_2026_0713, on the application file.

The response supplies material evidence concerning Great Dunmow's clean-water infrastructure:

- Affinity records 453 properties persistently below its 15-metre pressure reference level in 2025-26, compared with 81 in 2024-25. It separately records low-pressure incidents affecting 646 properties.

- Its cumulative modelling identifies additional network capacity as likely to be required as development demand increases.

- The reinforcement options identified by that modelling are expressly not confirmed final schemes. - It cannot supply quantified residual network headroom after committed connections under average-day, peak-day or peak-hour conditions.

- It holds no site-specific impact assessment for UTT/26/1635/OP, although the site was included in zonal growth screening.

The response describes previous reinforcement expenditure, but does not demonstrate the remaining capacity available for this application or provide a specific funded delivery programme for the further works identified.

The Council should therefore require a clear assessment reconciling existing demand, committed development and this proposal with available supply and local distribution capacity. This must identify the necessary works, accountable delivery bodies, funding, commissioning dates and enforceable occupation safeguards.

The existing pressure figures also require explanation, including whether the deterioration reflects a change in physical performance, monitoring or classification. The proposed development must not worsen supplies to existing residents.

Please obtain a formal scheme-specific response from Affinity and keep clean-water capacity unresolved until sufficient evidence and deliverable safeguards have been provided. The existence of strategic modelling or a future reinforcement option is not itself proof that the proposed development can be supplied satisfactorily.

Please confirm that this representation and attachment have been added to the public file and referred to the relevant consultees.

Kind regards,

Carl Rolph Save Church End