Construction traffic is a planning issue
The applicant's documents identify a heavy construction period. Any proposed route must work with the road as it is used by residents, not with parked vehicles or pedestrians assumed away.
UTT/26/1635/OP · traffic and road safety
St Edmunds Lane and Church End Bridge are not abstract lines on a plan. Their day-to-day use, parked cars, pedestrians, children, width restrictions and emergency access need to be tested in real conditions.
The applicant's documents identify a heavy construction period. Any proposed route must work with the road as it is used by residents, not with parked vehicles or pedestrians assumed away.
Church End Bridge has a weight restriction. The council needs an evidence-based, deliverable solution for the vehicles the proposal would require, before it can rely on that access.
Moving existing resident parking from one street into surrounding roads can create new obstruction and safety problems. The practical consequences need to be assessed openly.